Yard work...

DMD123

Administrator
Staff member
Contributing Member Level III
All concrete out and lines are cut in asphalt, which will be removed next
IMG_20260715_073206005_HDR.jpg
The asphalt was really bad and the thickness in some areas is like 1-1/2", no wonder why it was cracking!
IMG_20260715_073138112_HDR.jpg
 

DMD123

Administrator
Staff member
Contributing Member Level III
Better idea of the continuity of the driveway now with all the concrete and asphalt out
IMG_20260716_074317194_HDR.jpg
 

DMD123

Administrator
Staff member
Contributing Member Level III
With the new walkway we gain a bed in the front that will need to get planted. I want to put something with a bit of height but have to be careful because of the proximity to the house, walkway and having my power lines coming in that area. There are a couple of Japanese maples of interest but finding them may be a whole different story.
IMG_20260716_073249840_HDR.jpg
 

DMD123

Administrator
Staff member
Contributing Member Level III
First pour begins today! It will be the addition to patio in backyard and the space between the neighbors and in front of garage.
IMG_20260716_163914982_HDR.jpg
IMG_20260716_163751308_HDR.jpg
The bad news is that the temps next week being so excessive, they will wait until it cools to do the other two pours.
 
Top