All concrete out and lines are cut in asphalt, which will be removed next
The asphalt was really bad and the thickness in some areas is like 1-1/2", no wonder why it was cracking!
With the new walkway we gain a bed in the front that will need to get planted. I want to put something with a bit of height but have to be careful because of the proximity to the house, walkway and having my power lines coming in that area. There are a couple of Japanese maples of interest but finding them may be a whole different story.